Checkline DTX2 User Manual

Browse online or download User Manual for Measuring instruments Checkline DTX2. Checkline DTX2 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 8
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
INSTRUCTION MANUAL
2
2 YYEEAARR WWAARRRRAANNTTYY
(RESTRICTIONS APPLY)
Imada, Inc. warrants its products to the original purchaser to be free from defects in work-
manship and material under normal use and proper maintenance for two years (one year for
adapters, attachments and cables) from original purchase.This warranty shall not be effective
if the product has been subject to overload, shock load, misuse, negligence, accident or
repairs attempted by others than Imada, Inc.
During the warranty period, we will, at our option,either repair or replace defective products.
Please call our customer service department for a return authorization number and return the
defective product to us with freight prepaid.
The foregoing warranty constitutes the SOLE AND EXCLUSIVE WARRANTY, and we hereby
disclaim all other warranties, express, statutory or implied, applicable to the products and/or
software, including but not limited to all implied warranties of merchantability, fitness, non-
infringement, results, accuracy, security and freedom from computer virus. In no event shall
Imada, Inc. and/or its affiliated companies be liable for any incidental, consequential or punitive
damages in connection with the use of its products and/or software.
Model DTX2
Cap Torque Tester
Specifications subject to change without notice.
Page view 0
1 2 3 4 5 6 7 8

Summary of Contents

Page 1 - Cap Torque Tester

INSTRUCTION MANUAL22 YYEEAARR WWAARRRRAANNTTYY (RESTRICTIONS APPLY)Imada, Inc. warrants its products to the original purchaser to be free from defe

Page 2 - INTRODUCTION

page 15page 2DIMENSIONSModel Capacity (Resolution)lbf-in kgf-cm N-cmDTX2-15 15.00 (0.01 lbf-in) 20.00 (0.01 kgf-cm) 200.0 (0.1 N-cm)DTX2-40 40.00 (0.0

Page 3 - PRECAUTIONS

page 3page 14Accuracy ± 0.5% F.S. ± 1 LSDSelectable Units lbf-in, kgf-cm, and N-cmOverload Capacity 200% of F.S. Overload indicator flashes beyond 110

Page 4 - OPERATION

page 13page 4Power-Off programming Turn off the tester. Press again while holding to enterPower-Off programming (CF9 flashes with solid m0). Press

Page 5 - Power-On programming

page 5page 12Programming Setpoints (optional)Program High and Low setpoints for easy GO/NO GO testing. 1. Turn on the tester2. Press and for 3 secon

Page 6 - Storing Data into Memory

page 11page 6RECHARGING NI-MH BATTERY1. To maximize the life of the battery, power is automatically shutoff after 10 minutes of non-use or user-define

Page 7 - Clearing Data from Memory

page 7page 104. External Switch Display FreezeBy connecting #10 and #12of the communications port,the tester instantaneouslycaptures the critical read

Page 8 - COMMUNICATIONS PORT

page 9page 8COMMUNICATIONS PORT26 PIN CONNECTORPIN# DEFINITION1 RS-232C Signal Output2 RS-232C Receive Signal3 RS-232C Ground4 Analog Output ±2VDC5 An

Comments to this Manuals

No comments